PLAIN-ENGLISH UK PLANT REFERENCE

UK CNC Statutory Compliance Guides

Inspection intervals, record retention rules, and parent-utility dependency templates for British metal-machining and fabrication workshops.

COSHH LEV TExT Every 14 Months

Coolant-Mist & Fume Extraction Records

Linking central mist extractors to downstream CNC enclosures, capturing TExT findings, and tracking overdue remedials.

Read COSHH LEV TExT guide ->
PUWER & BRAKES Shift + Periodic

Interlocks, Guarding & Press-Brake Stopping Times

60-second operator pre-start evidence, optical light-curtain test logs, and enforced Two-Step Return to Service.

Read PUWER & BRAKES guide ->
LOLER 6M / 12M 6m Slings · 12m Cranes

Overhead Bay Cranes, Jib Hoists & Lifting Tackle

Separating 6-month accessory schedules from 12-month gantry examinations with immediate defect escalation.

Read LOLER 6M / 12M guide ->
PSSR 2000 WSE · 12–26 Months

Compressed Air Receivers & Written Schemes of Examination

Tracking the 250 bar·litres threshold, WSE intervals, 14-day Reg 10 notifications, and CNC air-utility cascades.

Read PSSR 2000 guide ->
ISO 9001 & 45001 Clause 7.1.3 · EICR · PAT

Audit-Ready ISO 9001 Clause 7.1.3, EICR/PAT & ISO 45001

Spindle-hour PM, EICR/PAT clarity, and 1-click HSE, ISO 9001 Clause 7.1.3, ISO 45001, and insurer evidence packs.

Read ISO 9001 & 45001 guide ->

PROBUS-PDF-V1 WORKBENCH

Original PDFs. Highlighted on the exact page. Zero AI hallucination.

Upload only the OEM manuals and statutory certificates your workshop holds rights to use into private tenant storage. Search jumps straight to verbatim passages and anchors remedials directly onto inspector findings.

Lane 2 normalises messy 06:30 queries (sv401 -> SV0401, eoc1 -> E.OC1, f30001 -> F30001) and surfaces clickable cross-reference jump pills (Pr.7, p1080, S11/S12).

LEV-MIST-01_TExT_2026.pdf · Page 4 of 9 OCR Rescued · 96%
SECTION 4 · THOROUGH EXAMINATION DEFECT SCHEDULE4.1 Hood face velocity at VMC-01 enclosure: 0.42 m/s (Below 0.50 m/s commissioning baseline)STATUTORY DEFECTDamper seal split on Bay 1 manifold branch (0.31 m/s).Action: Replace flange gasket & re-verify capture airflow within 14 days (HSG258).Inspector: A. Morris (BOHS P601) · Linked Asset: LEV-MIST-01 -> VMC-01, VMC-02, LATHE-01
Anchored Remedial #R-14 · Due 14d
Inspect Synthetic PDF in Demo ->

Fictional Precision Metal CNC worked example: Trent Valley Precision Machining Ltd (synthetic copyright-clean PDFs).