ISO 9001 & 45001 Clause 7.1.3 · EICR · PAT

ISO 9001 Clause 7.1.3 Infrastructure, Electrical EICR/PAT & ISO 45001 Packs

Aerospace, medical, automotive, and defence OEM buyers audit subcontract CNC shops against ISO 9001:2015 (Clause 7.1.3 Infrastructure and 7.1.5 Measuring Resources), ISO 45001:2018 OH&S controls, and Electricity at Work Regulations 1989 (EICR/PAT). ProCERT compiles deterministic evidence packs across four audit lenses without drifting into bloated ERP or metrology QMS software.

1. Electricity at Work Regulations 1989: EICR vs Risk-Based PAT

Under SI 1989/635 Reg 4(2), electrical systems must be maintained to prevent danger, while Regs 12–14 govern lockable isolation, proving dead (GS38), and live-working restrictions (HSE HSG85).

ScheduleStandard / GuidanceCNC Workshop Scope & Interval
EICRBS 7671 & IET Guidance Note 3 (GN3)Fixed 400V 3-phase feeders, busbars & bay boards up to machine isolators. IET GN3 benchmark: typically 3 years for industrial premises. C1 maps to immediate_prohibition; C2/FI to statutory_defect; C3 to advisory.
PATHSE HSG107 & IET CoP (5th Ed)No fixed 12-month statutory rule—risk-based intervals (3–6 months harsh 110V/230V workshop tools; longer for office IT). Hard-wired CNC centres fall under EICR + PUWER, not PAT.
CALIBRATION_REFISO 9001 Clause 7.1.5 (Commercial QMS)Lightweight pointer to external UKAS/gauge certs (gauge_or_instrument_id, ukas_lab_ref, within_tolerance). Triggers ADVISORY reminders rather than locking out CNCs.

2. ISO 9001:2015 Clause 7.1.3 & ISO 45001:2018 Alignment

ProCERT does not reproduce copyrighted ISO/BSI text and is not a metrology QMS. Instead, its operational data model gives auditors clean, verifiable evidence in seconds:

  • ISO 9001 Clause 7.1.3 (Infrastructure): Permanent qr_token plant register, monotonic spindle-hour + calendar PM history (pm_runs), and immutable Two-Step Return to Service fault-to-clearance records.
  • ISO 9001 Clause 7.1.5 (CALIBRATION_REF Pointer): Records gauge/CMM calibration certificate pointers and expiry reminders without polluting machine safety lockouts.
  • ISO 45001:2018 (Operational Control & Worker Participation): Live parent-utility cascades, named operator accountability (zero shared generic logins), server-enforced RBAC separation, and PDF-anchored remedial closures.

3. Four-Lens 1-Click Audit Packs

When an HSE Inspector, ISO auditor, or engineering insurance surveyor arrives, H&S Leads, Managers, or Read-Only Auditors generate a deterministic printable pack scoped to Whole Site, Single Bay, or Single Machine under one of four lenses: HSE Inspection, ISO 9001 Clause 7.1.3, ISO 45001, or Insurer Renewal.

Every pack renders in Light Default print typography with named actor attribution, UTC timestamps, and the mandatory Operational-Record Legal Disclaimer cover sheet.

Shop-Floor Operational Checklist

  • Keep hard-wired 3-phase CNC machines under EICR + PUWER Reg 5/6, reserving PAT schedules for plug-connected tools and portable equipment.
  • Map EICR C1 observations to immediate_prohibition and C2/FI observations to timed statutory_defect remedials.
  • Use CALIBRATION_REF pointers to surface approaching gauge/CMM due dates as ADVISORY alerts alongside Clause 7.1.3 plant maintenance.
  • Test your 1-Click Audit Pack across HSE Inspection and ISO 9001 Clause 7.1.3 lenses before external audit day.
COSHH LEV TExT Every 14 Months

Coolant-Mist & Fume Extraction Records

Read guide ->
PUWER & BRAKES Shift + Periodic

Interlocks, Guarding & Press-Brake Stopping Times

Read guide ->
LOLER 6M / 12M 6m Slings · 12m Cranes

Overhead Bay Cranes, Jib Hoists & Lifting Tackle

Read guide ->
PSSR 2000 WSE · 12–26 Months

Compressed Air Receivers & Written Schemes of Examination

Read guide ->