COSHH LEV TExT Every 14 Months

COSHH 2002 LEV Thorough Examination & Testing (14-Month Rule)

Metalworking fluid mist, neat cutting oils, laser/weld fume, and grinding dust are hazardous substances under COSHH 2002 (SI 2002/2677). Regulation 9(2)(a) sets a strict 14-month ceiling for Thorough Examination and Testing (TExT)—unless Schedule 4 mandates 6 months or 1 month.

1. Statutory Intervals: 14 Months vs Schedule 4 Exceptions

Most CNC shops treat coolant-mist extraction as an annual 12-month booking so Competent Person scheduling never breaches the legal 14-month maximum under COSHH Reg 9(2)(a). However, Schedule 4 Column 1 imposes far shorter ceilings on severe-wear metal processes.

COSHH ReferenceProcess / Plant ScopeMaximum Legal Interval
Reg 9(2)(a)General CNC coolant-mist extractors, oil-smoke units, laser/weld fume LEVAt least every 14 months
Schedule 4 (6M)Mechanical metal grinding, abrasion, or polishing (>12 hrs/week) & non-ferrous casting dust/fumeAt least every 6 months
Schedule 4 (1M)Abrasive blasting carried out in or incidental to cleaning metal castingsAt least every 1 month

2. What an HSG258 TExT Report Must Record

Under HSE HSG258 (Controlling airborne contaminants at work), an LEV Thorough Examination and Test is not a bare spreadsheet of airflow numbers. Your Competent Person (typically BOHS P601/P602 qualified) must evaluate current performance against the original commissioning baseline.

  • System identity & branch map: linked machine enclosures, flexible ducts, blast gates, and Schedule 4 process flag.
  • Commissioning baseline: design volumetric flow (m3/h), hood face velocity (m/s), capture velocity (m/s), and fan/filter static pressure (Pa).
  • Quantitative airflow readings & smoke/tracer containment check confirming mist does not escape into the operator breathing zone.
  • Explicit adequacy verdict and numbered defect schedule with rectification deadlines.

3. How ProCERT Models LEV-MIST-01 Utility Cascades

In real workshops, one central mist extractor (such as LEV-MIST-01) manifolds onto three or more CNC centres (VMC-01, VMC-02, LATHE-01). When LEV-MIST-01's certificate expires or an immediate_prohibition remedial is opened, ProCERT derives LOCKED_OUT and dependency_blocked = true live on every linked child machine.

Using probus-pdf-v1, your H&S Lead opens page 4 of the uploaded TExT PDF, draws a bounding box around Clause 4.1/4.2, and anchors the remedial directly to the inspector's exact words and coordinate box.

Shop-Floor Operational Checklist

  • Verify whether dry grinding (>12 hrs/week) or casting fettling places any extractor onto Schedule 4 (6M or 1M) rather than 14M.
  • Upload the original commissioning spec alongside every TExT PDF in your private tenant vault so face/capture velocity drops are visible.
  • Link parent extractors to every downstream CNC centre in asset_dependencies so overdue LEV never leaves machines appearing cleared.
  • Use 60 / 30 / 14 / 0-day reminders to book your Competent Person ahead of the 14-month ceiling and retain records for at least 5 years.
PUWER & BRAKES Shift + Periodic

Interlocks, Guarding & Press-Brake Stopping Times

Read guide ->
LOLER 6M / 12M 6m Slings · 12m Cranes

Overhead Bay Cranes, Jib Hoists & Lifting Tackle

Read guide ->
PSSR 2000 WSE · 12–26 Months

Compressed Air Receivers & Written Schemes of Examination

Read guide ->
ISO 9001 & 45001 Clause 7.1.3 · EICR · PAT

Audit-Ready ISO 9001 Clause 7.1.3, EICR/PAT & ISO 45001

Read guide ->