Coolant-Mist & Fume Extraction Records
Linking central mist extractors to downstream CNC enclosures, capturing TExT findings, and tracking overdue remedials.
UK CNC MACHINE SHOPS · 10–150 STAFF
Built for precision metal-machining floors — enforced Safety Stops, live LEV/LOLER/PSSR utility cascades, spindle-hour PM, and instant highlighted jumps inside your own OEM manuals.
Live sandbox link opens Trent Valley Precision Machining Ltd — a fictional Precision Metal CNC worked example (non-production, resets nightly 03:00 UTC).
Per-site & asset bands. Never per-seat — every setter keeps named PIN/badge accountability.
14-month LEV TExT, 6m/12m LOLER, PSSR WSE & live parent-utility lockouts.
Zero AI rewrites. Verbatim highlighted page jumps on manuals and certs you hold rights to use.
PO invoicing supported alongside physical oil-and-coolant-resistant QR asset plates.
Cascade: Blocked by upstream LEV-MIST-01 (14m COSHH TExT overdue)
Pre-start 06:12 UTC (S. Shaw) · 8,412.0 hrs
Select any stage below to inspect how ProCERT pairs 60-second gloved checks with server-enforced utility cascades and verbatim PDF troubleshooting.
Every machine guard carries a permanent oil-and-coolant-resistant QR plate (/q/<qrToken>). Setters authenticate via a 4–6 digit PIN or personal badge on paired bay tablets so every 60-second pre-start check, monotonic spindle-hour reading, and Safety Stop is attributed to a named person.
Shop-floor submissions carry client Idempotency-Key headers so intermittent workshop Wi-Fi retries never duplicate checks or spindle-hour entries.
VMC-01 · Bay 1 Pre-Start Check (D. Patel · 06:10 UTC)
Clear operational summaries covering COSHH 14-month LEV TExT, PUWER press-brake stopping times, LOLER 6m vs 12m schedules, PSSR 250 bar·litres receivers, and ISO 9001 Clause 7.1.3.
Linking central mist extractors to downstream CNC enclosures, capturing TExT findings, and tracking overdue remedials.
60-second operator pre-start evidence, optical light-curtain test logs, and enforced Two-Step Return to Service.
Separating 6-month accessory schedules from 12-month gantry examinations with immediate defect escalation.
Tracking the 250 bar·litres threshold, WSE intervals, 14-day Reg 10 notifications, and CNC air-utility cascades.
Bring one bay or your whole UK workshop online with unlimited shop-floor operators, UK BACS / PO invoicing, and a full SHA-256 exit archive guarantee.
Test an immediate Safety Stop, watch LEV-MIST-01 cascade across Bay 1, and search synthetic Fanuc/Pilz manuals without signing up.
Open demo.procert-solutions.dev ->